First installation in the field

First installation in the field

On November 29, 2019, we performed the first installation of the prototype device RAM-1 in the field:

  • Location: Uršlja Gora, Elektro Celje
  • System: 20 kV transmission line; transition from overhead line to cable line
  • Surge arresters: Ur = 30 kV, class DH
  • Test device settings:
connectivity2G
measurementsetting the measurement period in seconds: 3600
sendsetting the number of measurements taken by the device to send data: 24
gsmconnecttime when GSM / GPRS modem tries to connect to network in seconds: 50
smswaittime when GSM / GPRS modem waits for incoming SMS in seconds: 40
resultleakage current limit for sending an alarm – alarm condition in µA: 600

Tags: , , ,